Cooltech have just completed a large project to provide a heating and cooling system including heat recovery and toilet extraction to both the ground and first floors of a building in Isleworth, for The London Borough of Hounslow.
“A consequence of securing increased energy efficiency from our building stock is that our buildings have become more airtight (reports Alan Macklin – technical director of Elta Group).
Located in the heart of Mayfair, a few steps away from the most elegant shopping, C London welcomes with its timeless, elegant setting and buzzy atmosphere an eclectic crowd of Londoners and a very international clientele.
Lampton is a Humanities Specialist School, Leading Edge, and training school which currently has around 1,350 students on roll. COOLTECH worked with Lampton School regarding the installation of replacement of the fresh air system.
Following on from installations in their Westfield Centre Stratford and Oxford Street branches, Cooltech are pleased to announce the completion of its sixth store for the Calzedonia Group in the Kings Road, West London.
Intimissimi is the market leading underwear brand in Europe with over a thousand stores in 23 countries and part of Calzedonia, the Italian fashion group.
Project
Refurbishment of existing air conditioning units, duct work and ventilation.
Mechanical repairs to staff facilities including the kitchen area and rest-room.
Project
Working to our client’s space plan, we completed alterations to the base build VAV system and controls, installed new computer room air conditioning, fire dampers and extraction.