Remedial works successfully completed whilst maintaining the aesthetics of this beautiful property
The system was de-gassed in order to carry out modifications to existing pipework to prevent water penetrating through the wall where the pipes enter the building. A 4″ drain was recessed into the wall and pipes were installed into the main drain pipe. Once completed, pressure tests were executed on the new system over a 48 hour period. COOLTECH then commissioned the system.
For this project, our experienced engineers worked in a confined space, which made the project more challenging – this was due to the size of material and equipment needed.
The project was successfully completed in August 2013.