Recent Projects

  • 75

    Willow Tree Primary School

    Priors Farm Lane, Northolt, Middlesex, UB5 5DY
    Installation of wall mounted unit to provide dedicated cooling to the computer server room on the first floor.
  • 76

    University College Hospital

    235 Euston Road, London, NW1 2BU
    Working with our clients, Cooltech installed replacement fire dampers to the ductwork on the 4th & 9th floors.
  • 73

    Faber & Faber

    Bloomsbury House, 74-77 Great Russell Street, London, WC1B 3DA
    Working with our clients, Cooltech installed additional VRV floor mounted units and plumbing works to the tea point areas.
  • 82

    EBB

    Central Way, North Feltham Trading Estate, Feltham, Middlesex, TW14 0TW
    Working with our clients, Cooltech installed dedicated cooling to the computer server room on the first floor.
  • 54

    NEP Visions

    233-269 London Road, Staines, Middlesex, TW18 4JU
    Installation of ceiling cassettes, invoid ducted units and wall mounted units to the first floor offices.
  • 81

    DPT

    3rd & 4th Floors, 10 Eastbourne Terrace, Paddinton, London, W2 6LE
    Working with our clients, Cooltech installed chilled water fan coils to the 3rd & 4th floors.
  • 53

    Swiss Finance

    33 Cavendish Square, London, W1G 0PW
    Working with our clients, Cooltech installed additional toliet facilities and dedicated cooling to the computer room.
  • 59

    Langholm Capital

    5-11 Regents Street, London, SW1Y 4LR
    Working with our clients, Cooltech installed additional ventilation and alterations to the chilled water fan coils on the 1st floor.
  • 58

    Alchemy

    3rd Floor, 25 Bedford Street, London, WC2E 9ES
    Working with our clients, Cooltech installed fire rated ductwork and kitchen hood to the kitchen area.
  • 80

    Moorebrook

    Unit 9 Moorebrook, Southmead Industrial Estate, Oxon, OX11 7HP
    Working with our clients, Cooltech installed gas fired air heater to the main warehouse area including, dedicated air conditioning within the computer room.