Creating a Better Environment

New Home for COOLTECH​

January 2013

Due to the expansion of our customer base and after many years at our Ashford office, we have moved to a larger facility at The Old Forge in Old Windsor.

As with all moves it was a nerve wracking experience, with our main focus being on minimal disruption to operations and the needs of our clients. We were able to secure the property prior to leaving Ashford which enabled us to convert what was really just a building shell, into a workable office space. With the help of COOLTECH’s sister company Degree and using a basic design to get us operational as soon as possible, we completely gutted the building and made alterations to the floors, windows, ceilings, walls, power, in fact everything really. Including installing a new Daikin Altherma system which provides us with year round heating, cooling and hot water. We can even link solar panels to it, if the sun ever comes out. So if you are passing, pop in, we have a great coffee machine.